Thread: Calendar
View Single Post
  #5 (permalink)  
Old October 17th, 2007, 10:37
new_otm new_otm is offline
Member
 
Join Date: Jun 2007
Posts: 53
Thanks: 14
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
new_otm is on a distinguished road
Re: Calendar

Hi,
I have read the document Ignore Planning Constraints and i want to use the option calendar on location constraints, does anyone know how to?
Thanks.
Location Constraints

Calendar

When ignored, OTM assumes there is no calendar defined on a location role profile for this location. When calculating service time OTM bypasses checking whether a certain time is a work period.
Reply With Quote