| Re: rate config Hey Amm,
The base rate would be basically for the the 7 cartons, therefore do i need to give the ship unit there?
Like base cost for shipment (7 cartons considered for the rate) = $100
If more than 7 then add = $ 2 for each extra container
so if the carton in the load = 10 then rate will be 100 + 6 = 106.
But if i give per ship unit in the base rate then wont it charge the rate per piece. |