
October 6th, 2008, 11:48
|
| Member | | Join Date: Nov 2007 Location: Chennai, India
Posts: 77
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 8
Thanked 3 Times in 3 Posts
Rep Power: 2 | |
| Re: Multileg scenario with consolidation/deconsolidation pools Quote:
Originally Posted by Kiseleva Hi Arun!
I have exactly the same scenario but I've started from easier example. First of all I managed to plan shipments from A,B to hub C and then consolidated shipment from C-->D. There was not problem, but then when I tried to add one more leg I couldn't do it.
In the first leg I define hub C as a Cross Dock Location and location D as destination location for the leg. Second leg has destination F.
As a result system didn't use hub C in planning - I got four shipments: A-->D, D-->F, B-->D, D-->F.
But I expected to get A-->C, B-->C, C-->D, D-->F
May be you know what's wrong? | Did you tried constraining the Order Releases by checking the "Must Ship Thro Pool" checkbox?
__________________ Regds
Arun. |