Re: Building SELL Shipments (Time-Window Problem)

Hi alejandro,

I got the break-through. I constrainted DATA EMPHASIS as PAST in OR's Constraint tab and I was able to build shipments with old dates. Thanks a lot.

Kindly ignore the previous post.

Cheers

Sanju