View Single Post
  #6 (permalink)  
Old July 31st, 2007, 22:09
bmj_23 bmj_23 is offline
Senior Member and Blogger
 
Join Date: May 2007
Posts: 170
Thanks: 4
Thanked 31 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
bmj_23 will become famous soon enough
Re: Linking Air Freight Rate Records to Schedules

The other possible solution is to create different equipment (vehicle type on the flight schedule) for each departure. On your rate record, you could then specify the equipment as a rate condition which would select the correct rate based on the equipment on the flight schedule e.g a piece of equipment per flight...

As Alejandro says, the other thing to say is to try to constrain the rate offerings based on the departure time of the order, but that is not necessarily going to be the departure time of the flight, so not sure how that would figure out.

Depending on exact requirements, there may well be other solutions to this issue.