View Single Post
  #8 (permalink)  
Old August 7th, 2007, 15:05
joecallan joecallan is offline
Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 53
Thanks: 4
Thanked 7 Times in 7 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Linking Air Freight Rate Records to Schedules

I was able to link the records to the schedules using equipment.

Here is how I was able to do so:
  • I extracted the Vehicle Type table and used that data to create new Equipment Group IDs
  • I added the new Equipment Groups created in Step 1 against the Vehicle Types
  • I loaded the new Equipment Types to the Equipment Group Profile called AIRPLANES (for itinerary purposes)
  • I updated the air freight Rate Records with the new Equipment Group
Joe

Last edited by joecallan : August 7th, 2007 at 15:07. Reason: To change font coloring