| Re: Using Via Locations vs Interim Locations We have ruled out using Via Points and now know that interim points are the way that we would like to proceed (Interim Points appear as a stop on the shipment Stops tab). We have been successful building a TL shipment with an interim point, so I am now trying to plan a single legged AIR shipment using an interim point. This is what I have found: 1. An air order will create a shipment without an interim point on the itinerary. 2. An air order will not create a shipment with an interim point on the itinerary. 3. I tried adding an interim flight to the air schedule to simulate the hub to origin airport portion of the move - still unsuccessful. 4. I removed the interim point from the itinerary and the order planned using the schedule in #3. 5. I changed the itinerary leg to TL and the order plans with the interim stop included. Has anyone out there been successful using interim points with a mode profile of air? Thanks, Joe
Last edited by joecallan : August 15th, 2007 at 14:26.
Reason: misspelling
|