otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTMFAQ Tutorials

OTM SIG
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old July 25th, 2008, 14:07
Member
 
Join Date: Jul 2007
Posts: 35
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
JayVal is on a distinguished road
Bulk Plan

Hi :

We are running OTM 5.5 CU02 RU05.

We scheduled to run Bulk Plan every night. Most of the times the Bulk Plan takes long time to finish. Sometimes we are not sure even if the Bulk Plan is running or not or got stuck or whatever.

Is there anyway to monitor the progress the status the Bulk Plan ? I heard new releases of OTM has the capability to do that, but is there any to find the % complete and other info from within OTM logs.

I would really appreciate your help.

Thanks in advance.
Jay
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old October 22nd, 2008, 18:44
Junior Member
 
Join Date: Apr 2008
Posts: 3
Thanks: 1
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
BBraswell is on a distinguished road
Re: Bulk Plan

I don't think there is a % completed, located in the logs...but if the bulk plan is still actively writing information to the logs, then I would think that it was still in the process of running, however slow it may be.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old October 27th, 2008, 15:39
Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 53
Thanks: 4
Thanked 7 Times in 7 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Bulk Plan

JayVal:

Set the MINIMUM ORDERS FOR MILESTONE COLLECTION Parameter to a number that is less than the number of Orders being sent through the Bulk Planning Process (the Default is set to 50). Doing so will populate the Performance Tab of the Bulk Plan Manager. This may give you a better idea of where your bottlenecks are occurring.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
[SOLVED] Bulk plan works then stops cmcintos Planning 4 July 8th, 2008 19:26
Bulk Plan Logs marccrosby Planning 1 May 23rd, 2008 08:27
Bulk Plan JayVal Planning 4 April 22nd, 2008 23:06
Bulk Plan Vs Direct rj5316 Planning 1 December 3rd, 2007 13:38
[SOLVED] 5.5 CU3: Bulk Plan Does Not Consol A Subset Of Selected Orders Into Expected ianlo Planning 1 August 17th, 2007 01:28



All times are GMT. The time now is 04:21.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37