Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old October 10th, 2007, 10:52
Member
 
Join Date: Jun 2007
Posts: 77
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 15
Thanked 1 Time in 1 Post
Rep Power: 3
new_otm is on a distinguished road
Calendar

Hi,

I have two questions about calendars in OTM

1- Could i create a calendar with national days off (for example christmas) and without year? so i have to create the calendar once and it is useful all years.

2- Could i ignore the calendar in specific situations?

Thanks in advanced,
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old October 10th, 2007, 12:09
Senior Member and Blogger
 
Join Date: May 2007
Posts: 200
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 4
Thanked 36 Times in 35 Posts
Rep Power: 3
bmj_23 will become famous soon enough
Re: Calendar

Hi,

1. Yes you can. Either a) create a cyclical calendar with the normal activities you want and then add in activity calendar overrides or b) create an annual calendar which doesnt allow any activities on the standard national holiday dates.

2. There is some functionality in OTM to ignore certain planning constraints when you are building a shipment. This allows the user to select which constraints e.g. calendars should be ignored when building a shipment from the UI. There is some additional configuration required to enable this which I seem to remember is at the DB level and cannot be set via the UI (needs checking). Look for Igore Planning Constraints in the online help.

If you provide more details on the "specific situations" there may be other ways of achieving the same result (as is usually the case with OTM).
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old October 10th, 2007, 13:13
Member
 
Join Date: Jun 2007
Posts: 77
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 15
Thanked 1 Time in 1 Post
Rep Power: 3
new_otm is on a distinguished road
Re: Calendar

Hi,
Thanks for your answer but i have a question, if i create an annual calendar i have to select the start date and the finnish date so the holiday dates are only available for one year and not for the next ones.
For example christmas (25 th of december ) is a holiday date every year, so if i select 12/25/2007, next year 12/25/2008 how can i know that it is selected as holiday?.
Thanks.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old October 10th, 2007, 14:47
Senior Member and Blogger
 
Join Date: May 2007
Posts: 200
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 4
Thanked 36 Times in 35 Posts
Rep Power: 3
bmj_23 will become famous soon enough
Re: Calendar

Hi,

Yes, I think you have to define that 12/25 in 2007 and 12/25 in 2008 is a holiday in your geography. That date is not a public holiday in every region of the world, hence you need to define it - in much the same way that 07/04 is not a public holiday in other countries in the world apart from the USA.

Its not a big task to enter that via the UI, but if you feel it is, you could always upload the public holidays that are relevant for your implementation via CSV.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
The Following User Says Thank You to bmj_23 For This Useful Post:
new_otm (October 11th, 2007)
  #5 (permalink)  
Old October 17th, 2007, 10:37
Member
 
Join Date: Jun 2007
Posts: 77
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 15
Thanked 1 Time in 1 Post
Rep Power: 3
new_otm is on a distinguished road
Re: Calendar

Hi,
I have read the document Ignore Planning Constraints and i want to use the option calendar on location constraints, does anyone know how to?
Thanks.
Location Constraints

Calendar

When ignored, OTM assumes there is no calendar defined on a location role profile for this location. When calculating service time OTM bypasses checking whether a certain time is a work period.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old October 17th, 2007, 15:00
Member
 
Join Date: Nov 2006
Location: San Diego, CA
Posts: 77
Blog Entries: 2
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 0
Thanked 18 Times in 17 Posts
Rep Power: 4
AlejandroBarba is on a distinguished road
Re: Calendar

Hi New_OTM,

The steps to Ignore the Calendar constraint are the following:

Select the order release that you want to plan
- Go to Actions / Create Buy Shipment / Direct
- The new window will show 'Ignore The Following Fields"
- Click the Arrow right next to Location Constraints
- Select Calendar
- Click OK
- A new window will pop up, Click OK again
- A confirmation screen with the new shipment should appear

Hope this helps,

Alejandro B.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7 (permalink)  
Old October 17th, 2007, 15:28
Member
 
Join Date: Jun 2007
Posts: 77
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 15
Thanked 1 Time in 1 Post
Rep Power: 3
new_otm is on a distinguished road
Re: Calendar

Hi,
I have a problem when i try to create buy shipment/direct the first window i see is named Create message direct shipment / team.
Should i configure something to see this constraints options? I have OTM 5.5 CU3
Thanks
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #8 (permalink)  
Old October 17th, 2007, 15:51
Member
 
Join Date: Nov 2006
Location: San Diego, CA
Posts: 77
Blog Entries: 2
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 0
Thanked 18 Times in 17 Posts
Rep Power: 4
AlejandroBarba is on a distinguished road
Re: Calendar

Hi new_otm,

I am in OTM 4.5 and I was not expecting the process to be different in 5.5.

I am not sure but it does not seem to me like you need to configure something in order the see the options, my gutt feeling is that the "Create message direct shipment / team" is something that was added to the process. If none of the fields have a red asterisk next to them, could you please try to go to the Next screen in a Test Environment?

Hope this helps,

Alejandro B.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #9 (permalink)  
Old October 17th, 2007, 17:25
Member
 
Join Date: Jun 2007
Posts: 77
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 15
Thanked 1 Time in 1 Post
Rep Power: 3
new_otm is on a distinguished road
Re: Calendar

Hi Alejandro,

The next window after select Create Buy Shipment / Direct is Create Direct Shipment / Equipment Prompt, i have two options Equipment Group ID and Equipment Group ID profile this two fileds are not obligatory so i click on ok and the shipement is create.
Thnaks in advance
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #10 (permalink)  
Old October 17th, 2007, 17:36
Member
 
Join Date: Nov 2006
Location: San Diego, CA
Posts: 77
Blog Entries: 2
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 0
Thanked 18 Times in 17 Posts
Rep Power: 4
AlejandroBarba is on a distinguished road
Re: Calendar

Hi new_otm,

The window that you mentioned is the same that I get before creating the shipment, without actually seeing OTM 5.5 it is hard for me to know how the process have changed. Nevertheless, it seems like you managed to plan the shipment as you needed, is that right?

Regards,

Alejandro B.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Calendar Issue joecallan Planning 0 September 10th, 2008 14:41
Calendar Creation Christopher Collins Planning 2 September 5th, 2008 13:03
ground schedule overrules calendar? sascha.harlfinger Planning 0 April 10th, 2008 16:11
[SOLVED] rates based on calendar in 5.0 soujanya Rating 1 July 9th, 2007 14:52
OTM SIG Calendar of Events chrisplough News and Events 0 May 7th, 2007 17:58



All times are GMT. The time now is 19:03.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40