otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTMFAQ Tutorials

OTM SIG
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Tags: , ,

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old December 14th, 2006, 01:19
Junior Member
 
Join Date: Dec 2006
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
Brian.Hogue is on a distinguished road
Consolidation orders using itineraries

Does anyone know how to consolidate orders onto different shipment legs of a mutlileg itinerary?

I have 1 order to ship from A to B, a second order to ship from A to C. I would like to plan both order to ship form A to B and then ship the second order from B to C.

Bulk plan fails. I can plan the first order direct and the second order using a itinerary to relay to B. I then have to merge the 2 shipments together that travel from A to B.

There has to be an easier way.

Anyone have a suggestion I could try?
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old December 14th, 2006, 07:55
Junior Member
 
Join Date: Dec 2006
Location: Mumbai, India
Posts: 4
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
Arun George is on a distinguished road
Question

Hi Brian,

One of the ways of tackling this is to create a region which has both locations B and C included in it.
In the itinerary remember to create it from location to region

Cheers!
Arun
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old December 14th, 2006, 11:05
Junior Member
 
Join Date: Dec 2006
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
Brian.Hogue is on a distinguished road
Hello Arun,

We typically use 2 types of itineraries. The most common is set up as Country to Country. (99% of our shipment are in the United States) I've set up other itineraries that are country to country with the first leg having a defined leg end point destination ID (one of our warehouses)

I want to create 2 shipments. The first shipment should bring both Orders from point A (supplier) to point B (my warehouse), unload one Order. A second shipment will transfer the second Order from point B to Point C (my second warehouse).

My itinerary works when all orders go from A to B then B to C.

Brian
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old December 14th, 2006, 21:08
Junior Member
 
Join Date: Dec 2006
Location: Holly Springs, NC
Posts: 19
Thanks: 0
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 1 Time in 1 Post
Rep Power: 0
JoeMac is on a distinguished road
It could be a couple of things. In a multi-leg, OTM is looking to build two different shipments. In the process it's looking to deconsolidate the first shipment at the second location. If your itinerary is set up with an 'Equipment Assignment Type' of Optimize Equipment this might be the case. It may work if you change this setting to 'Re-Use Equipment'.

There also might be an issue with your Location Roles. Ship From/Ship To may not allow the deconsolidation/re-consolidation at Location B (First Warehouse). You may have to change it to X-Dock in order to make it work.

Those are some low hanging fruit type questions and without knowing your configuration. If the problem does not fall into these areas let me know and maybe we can talk.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Consolidation / Deconsolidation and Cross Docking Scenarios ! ragsridh Planning 5 December 17th, 2007 07:06
Problem - Notifications - CONSOLIDATION PROFILE Sanju Workflow 0 September 12th, 2007 07:47
[SOLVED] Air Freight Itineraries joecallan Planning 2 August 8th, 2007 15:09
Order Templates and Itineraries/shipment Template runinord Planning 0 February 14th, 2007 19:47
[SOLVED] Itineraries jherzig Planning 1 August 31st, 2006 13:46



All times are GMT. The time now is 11:45.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37