otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTMFAQ Tutorials

OTM SIG
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Tags: ,

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old February 1st, 2008, 14:21
Junior Member
 
Join Date: Mar 2007
Posts: 7
Thanks: 1
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
skunniyur is on a distinguished road
Post Continuous Move , Dedicated Loads.

Hi;
Does anyone have documents on configuring continuous moves / dedicated loads?
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old February 4th, 2008, 12:03
Member
 
Join Date: May 2007
Posts: 94
Thanks: 21
Thanked 4 Times in 4 Posts
Groans: 2
Groaned at 0 Times in 0 Posts
Rep Power: 2
krishna.kk is on a distinguished road
Re: Continuous Move , Dedicated Loads.

HI,

Please let us know if have you have got any documents on configuring continuous moves / dedicated loads
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old February 5th, 2008, 17:48
Junior Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 29
Thanks: 4
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Continuous Move , Dedicated Loads.

If you look at the Day 1 Presentation from the OTM SIG Conference, you will see a presentation from Chris Starks which talks about Continuous Move setup. Follow this link:

http://www.otmfaq.com/forums/f31/otm...entations-417/ (OTM SIG User Conference 2007: Presentations)
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old February 6th, 2008, 06:07
Member
 
Join Date: May 2007
Posts: 72
Thanks: 16
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
rj5316 is on a distinguished road
Re: Continuous Move , Dedicated Loads.

Hi, we have followed the ppt .. but still get an error saying "cont move: not allowed on the shipment xxxxxx". This is the second shipment selected. we have set the plan para according to the ppt

pls advice...

rgds--
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old February 8th, 2008, 21:49
Junior Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 29
Thanks: 4
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Continuous Move , Dedicated Loads.

See the attachment for configuration screenshots.

Scenario:

Order Release 1: K12 to K23
Order Release 2: K45 to K67

Attached Files
File Type: doc CM Tour LOOKUP Screen Shots.doc (628.5 KB, 24 views)
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
The Following User Says Thank You to joecallan For This Useful Post:
rj5316 (February 27th, 2008)
  #6 (permalink)  
Old February 27th, 2008, 07:27
Member
 
Join Date: May 2007
Posts: 72
Thanks: 16
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
rj5316 is on a distinguished road
Re: Continuous Move , Dedicated Loads.

Hi Joe,

Thanks we were able to create the continuous move based on your inputs.

We are only able to manually find & link the shipments created using the appropraite planning parameter sets, however, we are unable to create such a continuos move automatically.

Alos we have noted the agent called "FINdAND CREATE CONTINUOUS MOVE", wonder if this is useful and if so how......

thanks again for u=your help....

Ravi & Kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7 (permalink)  
Old February 27th, 2008, 09:59
Member
 
Join Date: May 2007
Posts: 94
Thanks: 21
Thanked 4 Times in 4 Posts
Groans: 2
Groaned at 0 Times in 0 Posts
Rep Power: 2
krishna.kk is on a distinguished road
Re: Continuous Move , Dedicated Loads.

hi skunniyur,

Joe had attached a document under the same theard dated 9 feb .

Thas working fine .

Rgds
kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
OTM 5.5: Unable to Move Order Movements to Shipments ianlo Order Processing 13 Yesterday 16:45
Very unstable appserver since Linux move Kristof Stevens Performance, Scalability and HA 4 February 9th, 2008 19:09
How do I move back a step in the console installer? chrisplough Installation and Upgrades 2 November 14th, 2007 20:42
Dedicated Security pool exhausted sknmail@rediffmail.com Performance, Scalability and HA 3 November 14th, 2007 15:30
Multi Stop Loads cwarner Planning 0 October 31st, 2007 17:48



All times are GMT. The time now is 01:18.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36