March 20th, 2009, 09:53
| | Senior Member | | Join Date: Dec 2007 Location: Mumbai
Posts: 133
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 13
Thanked 4 Times in 4 Posts
Rep Power: 3 | | | Dynamic Trip (No of Equipments) Hi,
While defining dynamic trip schedule, when the blank shipment is created the number of equipments assigned is one. Can this functionality meant only for a single vehicle's movement? or is there any way that we can assign /generate multiple equipments against the blank shipment.
Another question is that if we uncheck the equipment capacity then also OTM is attaching the orders which exceed the equipment capacity to the same shipment instead of failing it or generating new equipment ID's. (In itinerary-I have tried to fiddle with all these options -Consol into one ship multiequip/Consol into one equip with Equipment assignment types of No Equipment/Optimized equipment)
Please let me know if any setups needed for generating multiple equipments/restraining orders from getting planned when excess capacity has reached.
Regards,
Vipin | 
April 7th, 2009, 10:18
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | | Re: Dynamic Trip (No of Equipments) Hi Vipin,
As per my understanding, a planned shipment in OTM is synonymous to one equipment only i.e. any shipment created via OTM planning engine cannot have more than one equipment.
Though more than one equipment can be assigned to one shipment; but that has to be done manually only. Planning engine cannot do so.
__________________ Regards,
Nipun Lakhotia
OTM Center of Excellence, Infosys | 
April 7th, 2009, 11:30
| | Senior Member | | Join Date: Dec 2007 Location: Mumbai
Posts: 133
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 13
Thanked 4 Times in 4 Posts
Rep Power: 3 | | | Re: Dynamic Trip (No of Equipments) Hi Nipun,
Having a single equipment will not just serve the purpose. I was hoping that some one could provide a work around to this problem.
Regards,
Vipin | 
April 8th, 2009, 17:28
| | Senior Member and Blogger | | Join Date: May 2007
Posts: 200
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 4
Thanked 36 Times in 35 Posts
Rep Power: 3 | | | Re: Dynamic Trip (No of Equipments) Just FYI, the planning engine can create more than one equipment on a single shipment. This is controlled by the setting "Create Single Shipment" on the itinerary leg. I have used this many times.
The on-line help says "you can mark the Create Single Shipment check box to have Oracle Transportation Management create one shipment for the leg and assign multiple equipment. If you want to place multiple equipment on the same shipment, then you must select this check box".
I have not used this in conjunction with trip schedules. Let me know what you find out. | 
April 9th, 2009, 05:11
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | | Re: Dynamic Trip (No of Equipments) Thanks for the information. It was of great help. | 
April 9th, 2009, 11:55
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | | Re: Dynamic Trip (No of Equipments) If planning engine is allowed to create shipments with more than one equipment (using "Create Single Shipment" on the itinerary leg option), then there will be not limit on no. of equipments allowed on single shipment. In other words, there will always be one shipment for a given OR, irrespective of load(weight/volume) on that OR.
Scenario:
Equipment: 500LB/100cuft
OR1: 1000LB/150cuft -----> 1 Shipment with 2 equipments
OR2: 2000LB/200cuft -----> 1 Shipment with 4 equipments
OR3: 4000LB/150cuft -----> 1 Shipment with 8 equipments
How to explain the above scenario?
__________________ Regards,
Nipun Lakhotia
OTM Center of Excellence, Infosys | 
April 9th, 2009, 12:19
| | Senior Member | | Join Date: Dec 2007 Location: Mumbai
Posts: 133
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 13
Thanked 4 Times in 4 Posts
Rep Power: 3 | | | Re: Dynamic Trip (No of Equipments) Hi BMJ,
Thanks for your reply. Problem with Single Shipment checkmark appears in case of fixed schedule(Dynamic trip/static trip), there multiple equipments are not getting generated because by default empty shipment has only one equipment. In case we are having the itinerary without the schedules then this option works fine .
I am as well thinking whether dynamic trip should be used for a fixed route to suggest no of equipments or not?
Regards,