otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
 Follow New Posts:Twitter
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTM Wiki

OTM SIG
OTM Wiki
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old March 20th, 2009, 09:53
Senior Member
 
Join Date: Dec 2007
Location: Mumbai
Posts: 133
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 13
Thanked 4 Times in 4 Posts
Rep Power: 3
cool_brat is on a distinguished road
Send a message via AIM to cool_brat Send a message via Yahoo to cool_brat Send a message via Skype™ to cool_brat
Dynamic Trip (No of Equipments)

Hi,

While defining dynamic trip schedule, when the blank shipment is created the number of equipments assigned is one. Can this functionality meant only for a single vehicle's movement? or is there any way that we can assign /generate multiple equipments against the blank shipment.

Another question is that if we uncheck the equipment capacity then also OTM is attaching the orders which exceed the equipment capacity to the same shipment instead of failing it or generating new equipment ID's. (In itinerary-I have tried to fiddle with all these options -Consol into one ship multiequip/Consol into one equip with Equipment assignment types of No Equipment/Optimized equipment)

Please let me know if any setups needed for generating multiple equipments/restraining orders from getting planned when excess capacity has reached.

Regards,
Vipin
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old April 7th, 2009, 10:18
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Re: Dynamic Trip (No of Equipments)

Hi Vipin,

As per my understanding, a planned shipment in OTM is synonymous to one equipment only i.e. any shipment created via OTM planning engine cannot have more than one equipment.

Though more than one equipment can be assigned to one shipment; but that has to be done manually only. Planning engine cannot do so.
__________________
Regards,
Nipun Lakhotia
OTM Center of Excellence, Infosys
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old April 7th, 2009, 11:30
Senior Member
 
Join Date: Dec 2007
Location: Mumbai
Posts: 133
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 13
Thanked 4 Times in 4 Posts
Rep Power: 3
cool_brat is on a distinguished road
Send a message via AIM to cool_brat Send a message via Yahoo to cool_brat Send a message via Skype™ to cool_brat
Re: Dynamic Trip (No of Equipments)

Hi Nipun,

Having a single equipment will not just serve the purpose. I was hoping that some one could provide a work around to this problem.

Regards,
Vipin
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old April 8th, 2009, 17:28
Senior Member and Blogger
 
Join Date: May 2007
Posts: 200
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 4
Thanked 36 Times in 35 Posts
Rep Power: 3
bmj_23 will become famous soon enough
Re: Dynamic Trip (No of Equipments)

Just FYI, the planning engine can create more than one equipment on a single shipment. This is controlled by the setting "Create Single Shipment" on the itinerary leg. I have used this many times.

The on-line help says "you can mark the Create Single Shipment check box to have Oracle Transportation Management create one shipment for the leg and assign multiple equipment. If you want to place multiple equipment on the same shipment, then you must select this check box".

I have not used this in conjunction with trip schedules. Let me know what you find out.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old April 9th, 2009, 05:11
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Re: Dynamic Trip (No of Equipments)

Thanks for the information. It was of great help.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old April 9th, 2009, 11:55
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Re: Dynamic Trip (No of Equipments)

If planning engine is allowed to create shipments with more than one equipment (using "Create Single Shipment" on the itinerary leg option), then there will be not limit on no. of equipments allowed on single shipment. In other words, there will always be one shipment for a given OR, irrespective of load(weight/volume) on that OR.

Scenario:
Equipment: 500LB/100cuft

OR1: 1000LB/150cuft -----> 1 Shipment with 2 equipments
OR2: 2000LB/200cuft -----> 1 Shipment with 4 equipments
OR3: 4000LB/150cuft -----> 1 Shipment with 8 equipments

How to explain the above scenario?
__________________
Regards,
Nipun Lakhotia
OTM Center of Excellence, Infosys
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7 (permalink)  
Old April 9th, 2009, 12:19
Senior Member
 
Join Date: Dec 2007
Location: Mumbai
Posts: 133
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 13
Thanked 4 Times in 4 Posts
Rep Power: 3
cool_brat is on a distinguished road
Send a message via AIM to cool_brat Send a message via Yahoo to cool_brat Send a message via Skype™ to cool_brat
Re: Dynamic Trip (No of Equipments)

Hi BMJ,
Thanks for your reply. Problem with Single Shipment checkmark appears in case of fixed schedule(Dynamic trip/static trip), there multiple equipments are not getting generated because by default empty shipment has only one equipment. In case we are having the itinerary without the schedules then this option works fine .

I am as well thinking whether dynamic trip should be used for a fixed route to suggest no of equipments or not?

Regards,
Vipin
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Dynamic Planning/Rating from Shipment Actuals raj73 Planning 1 November 3rd, 2008 08:36
Dynamic Trip cool_brat Planning 0 June 15th, 2008 12:24
dynamic linking neelimachenta Reports / BI / FTI and Other Analytics 0 August 27th, 2007 07:39
Dynamic List in OTM Nisha Reports / BI / FTI and Other Analytics 0 August 22nd, 2007 10:18



All times are GMT. The time now is 00:42.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40