Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Tags: ,

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old January 10th, 2008, 10:35
Senior Member
 
Join Date: May 2007
Posts: 101
Thanks: 21
Thanked 4 Times in 4 Posts
Groans: 2
Groaned at 0 Times in 0 Posts
Rep Power: 2
krishna.kk is on a distinguished road
Equipment

Hi ,


I have senarioi where i need only shipment that need to be build with multiple equimnets untis .

Scenario:

Equipment Group profile has one equipment attachedto it and the equipment capacity is 25 tons .

Now i have order release with 50 tons when i tried to plan the shipments its not building coz its morethen the equipment capacity.

When i check the splitable option in the order release its planiing Two shipments.

All i need is One shipment need to be created with two equipments in it .


Please advice .

Rgds
Kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old January 15th, 2008, 13:38
Member and Blogger
 
Join Date: Jan 2007
Location: Haalderen, Netherlands
Posts: 117
Blog Entries: 1
Thanks: 7
Thanked 33 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
bob_romijn is on a distinguished road
Send a message via Skype™ to bob_romijn
Re: Equipment

Hi Kishore,

The things to do:

- In the itinerary set: "Auto Consolidation Type" to "Consolidate into One Shipment / Multiple equipment" and check "Create Single Shipment".

This will do the trick.

Best regards,

Bob
__________________
Best Regards,

Bob Romijn
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
The Following User Says Thank You to bob_romijn For This Useful Post:
krishna.kk (January 16th, 2008)
  #3 (permalink)  
Old January 16th, 2008, 03:46
Senior Member
 
Join Date: May 2007
Posts: 101
Thanks: 21
Thanked 4 Times in 4 Posts
Groans: 2
Groaned at 0 Times in 0 Posts
Rep Power: 2
krishna.kk is on a distinguished road
Re: Equipment

Bob ,

Thanks for thr reply .

Is there any way to assign Equipment Number to the shipment .

Rgds,
Kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old January 16th, 2008, 07:18
Member and Blogger
 
Join Date: Jan 2007
Location: Haalderen, Netherlands
Posts: 117
Blog Entries: 1
Thanks: 7
Thanked 33 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
bob_romijn is on a distinguished road
Send a message via Skype™ to bob_romijn
Re: Equipment

Hi Kishore,

Do you mean the Equipment ID or the number of equipments?

I forgot 1 thing:
If you want to rate the shipment to the number of equipments used you have to set the rate base as "Equipment". The Unit will be automatically "1" (per number of equipment)

If you then create a shipment which uses 2 pieces of equipment you will get a cost amount of twice the equipment cost. You also get to equipment records in the second tab. To each equipment record you can add a seperate number or ID.

Best regards,

Bob
__________________
Best Regards,

Bob Romijn
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old January 16th, 2008, 09:08
Senior Member
 
Join Date: May 2007
Posts: 101
Thanks: 21
Thanked 4 Times in 4 Posts
Groans: 2
Groaned at 0 Times in 0 Posts
Rep Power: 2
krishna.kk is on a distinguished road
Re: Equipment

ROB,

I tried doing the way you said"In the itinerary set: "Auto Consolidation Type" to "Consolidate into One Shipment / Multiple equipment" and check "Create Single Shipment" but its not creating the shipment.

Should i change any thing in the Planning parameter.

Rgds
Kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old January 16th, 2008, 09:18
Member and Blogger
 
Join Date: Jan 2007
Location: Haalderen, Netherlands
Posts: 117
Blog Entries: 1
Thanks: 7
Thanked 33 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
bob_romijn is on a distinguished road
Send a message via Skype™ to bob_romijn
Re: Equipment

Hi Kishore,

As far as I know there is no parameter I set for this.
In the itinerary is the "Primary Leg" checkbox on? I can remeber that this was ian issue.

Please let me know whether that did the trick.

Best regards,

Bob
__________________
Best Regards,

Bob Romijn
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7 (permalink)  
Old January 16th, 2008, 10:40
Senior Member
 
Join Date: May 2007
Posts: 101
Thanks: 21
Thanked 4 Times in 4 Posts
Groans: 2
Groaned at 0 Times in 0 Posts
Rep Power: 2
krishna.kk is on a distinguished road
Re: Equipment

Bob,

I tried it but its not working .


Rgds
Kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #8 (permalink)  
Old January 16th, 2008, 11:07
Member and Blogger
 
Join Date: Jan 2007
Location: Haalderen, Netherlands
Posts: 117
Blog Entries: 1
Thanks: 7
Thanked 33 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
bob_romijn is on a distinguished road
Send a message via Skype™ to bob_romijn
Re: Equipment

Hi,

I just dived into my config and list here the things that are set which I didn't mention before:

- Itinerary detail: Equipment assignment type: "Optimise Equipment".

I also checked my planning parameters, but they are all default except for a few that don't have to do with this.

If it still doesn't work, you should look to something else which is not OK. Dates, etc.

Best regards,

Bob
__________________
Best Regards,

Bob Romijn
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
The Following User Says Thank You to bob_romijn For This Useful Post:
krishna.kk (January 16th, 2008)
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Wrong Results With Equipment Reference Units (again!) - 5.5 CU3 RU4 ianlo Planning 10 July 16th, 2008 05:06
OTM 5.5 CU3: Equipment Reference Units? ianlo Planning 11 March 5th, 2008 00:15
Mass changing equipment group during planning Tuuk79 Planning 0 February 12th, 2008 19:52
[SOLVED] Equipment group and planning Tuuk79 Planning 1 January 18th, 2008 16:22
Selection of Equipment using Temp_Control_ID Sanju Planning 0 June 22nd, 2007 09:00



All times are GMT. The time now is 18:25.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37