Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old April 10th, 2008, 17:11
Junior Member
 
Join Date: Apr 2007
Posts: 1
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
sascha.harlfinger is on a distinguished road
Send a message via ICQ to sascha.harlfinger Send a message via AIM to sascha.harlfinger
ground schedule overrules calendar?

Hi Experts...
I have following scenario:
I have TL shipments between A and B. This TL shipment is based on a ground schedule with fixed departure and arrival times.
The following shipment (TL or LTL) from B to C should start one day later to give the site B some time to handle the goods (e.g.: labeling, re-packing, etc.).

What I did is I put a second Repetition Schedule Activity on the 2nd stop of the ground schedule:
1. Arrive +1 (day), 10 (hours), 00 (minutes)
2. Depart +2 (day), 08 (hours), 00 (minutes)

This works as far as there are no days closed on the location calendar of site B (e.g.: Sat, Sun closed due to weekend).

My issue is that the shipment from B to C starts on the next day even if the location B is defined to be closed on the location calendar (location role SHIP FROM/SHIP TO).

In the calendar definition for site B I tried the following options to define the days as closed and to force the ground schedule to ignore these days and look for the next day defined as open:
- CLOSED (perform)
- LOAD (don't perform)
- ACTIVATE (don't perform)
- PICKUP (don't perform)
- DISPATCH (don't perform)
- OTHERS (don't perform)

I really have no idea what else I can try and the OTM help doesn't help a lot...

May be one of you has some hints what else I can try!

System details (OTM Info):
Software Version Otmv553
Software Build Number 5.5 (Patch) (20070510220)
Software Patch Version
OTMv5

Thanks in advance for all your ideas!

Greetz

--Sascha
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Ground Schedule (Static) cool_brat Planning 5 June 2nd, 2009 13:53
Ground Schedule (static trips) marccrosby Planning 0 May 6th, 2008 14:18
Ground Schedule (static route) help needed marccrosby Planning 3 May 6th, 2008 14:11
Attaching Order Releases to a ground schedule rj5316 Order Processing 1 December 3rd, 2007 10:54
OTM 5.5: Ground Transport Modelling ianlo Planning 4 September 15th, 2007 07:48



All times are GMT. The time now is 17:45.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40