Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old April 10th, 2008, 17:11
Junior Member
 
Join Date: Apr 2007
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
sascha.harlfinger is on a distinguished road
Send a message via ICQ to sascha.harlfinger Send a message via AIM to sascha.harlfinger
ground schedule overrules calendar?

Hi Experts...
I have following scenario:
I have TL shipments between A and B. This TL shipment is based on a ground schedule with fixed departure and arrival times.
The following shipment (TL or LTL) from B to C should start one day later to give the site B some time to handle the goods (e.g.: labeling, re-packing, etc.).

What I did is I put a second Repetition Schedule Activity on the 2nd stop of the ground schedule:
1. Arrive +1 (day), 10 (hours), 00 (minutes)
2. Depart +2 (day), 08 (hours), 00 (minutes)

This works as far as there are no days closed on the location calendar of site B (e.g.: Sat, Sun closed due to weekend).

My issue is that the shipment from B to C starts on the next day even if the location B is defined to be closed on the location calendar (location role SHIP FROM/SHIP TO).

In the calendar definition for site B I tried the following options to define the days as closed and to force the ground schedule to ignore these days and look for the next day defined as open:
- CLOSED (perform)
- LOAD (don't perform)
- ACTIVATE (don't perform)
- PICKUP (don't perform)
- DISPATCH (don't perform)
- OTHERS (don't perform)

I really have no idea what else I can try and the OTM help doesn't help a lot...

May be one of you has some hints what else I can try!

System details (OTM Info):
Software Version Otmv553
Software Build Number 5.5 (Patch) (20070510220)
Software Patch Version
OTMv5

Thanks in advance for all your ideas!

Greetz

--Sascha
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Attaching Order Releases to a ground schedule rj5316 Order Processing 1 December 3rd, 2007 10:54
Calendar new_otm Planning 13 October 22nd, 2007 15:36
OTM 5.5: Ground Transport Modelling ianlo Planning 4 September 15th, 2007 07:48
OTM SIG Calendar of Events chrisplough News and Events 0 May 7th, 2007 18:58
[SOLVED] CU schedule for v5.5 Barnett , Jada Email List Archive 0 January 24th, 2007 19:51



All times are GMT. The time now is 04:53.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37