otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTMFAQ Tutorials

OTM SIG
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old April 29th, 2008, 06:22
Member
 
Join Date: Dec 2007
Location: Mumbai
Posts: 62
Thanks: 8
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 1
cool_brat is on a distinguished road
Send a message via AIM to cool_brat Send a message via Yahoo to cool_brat Send a message via Skype™ to cool_brat
Ground Schedule (Static)

I see a disconnect between Ground Schedule(Static Trip) and rate service .
Could someone let me know how rate service is connected to ground schedule.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old April 29th, 2008, 07:01
AMM AMM is offline
Junior Member
 
Join Date: Jan 2008
Posts: 11
Thanks: 0
Thanked 4 Times in 4 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
AMM is on a distinguished road
Re: Ground Schedule (Static)

Ground schedule is usually associated to rate service by the repetition schedule service - specify the rate service type as "GROUNDSCHEDULE" and in rate service details, insert the repetition schedule service. This will link your ground schedule to a rate service when planning is considering the schedule.

However, for static trips, (from the OTM help) "Static Trips: Used for creating empty shipments for a predetermined route and then moving order releases on to those shipments. It involves setting up a trip template and specifying all the trip stop times for the template"
i.e. if you specify all of the trip stop times, you don't need a rate service.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old April 29th, 2008, 07:36
Member
 
Join Date: Dec 2007
Location: Mumbai
Posts: 62
Thanks: 8
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 1
cool_brat is on a distinguished road
Send a message via AIM to cool_brat Send a message via Yahoo to cool_brat Send a message via Skype™ to cool_brat
Re: Ground Schedule (Static)

Hi AMM,

Thanx for your reply. I have created the trip template and defined all the stops.

While creating the shipment ,

System is picking up all the stops while rate distances and rates are not picked by system.

So how these values can be picked if rate service is not required in case of static trip.

regards
Vipin
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old April 29th, 2008, 19:11
Member
 
Join Date: Dec 2007
Location: Mumbai
Posts: 62
Thanks: 8
Thanked 1 Time in 1 Post
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 1
cool_brat is on a distinguished road
Send a message via AIM to cool_brat Send a message via Yahoo to cool_brat Send a message via Skype™ to cool_brat
Re: Ground Schedule (Static)

Hi,

I have come across a meta link note that rate offering , rate record, transport mode and service provider will reflect when release schedule instance is clicked. However, when I am trying to release the schedule instance then Null pointer exception is coming.

Has any one come across any issue like this?

regards
Vipin



Quote:
Originally Posted by cool_brat View Post
Hi AMM,

Thanx for your reply. I have created the trip template and defined all the stops.

While creating the shipment ,

System is picking up all the stops while rate distances and rates are not picked by system.

So how these values can be picked if rate service is not required in case of static trip.

regards
Vipin
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Ground Schedule (static route) help needed marccrosby Planning 3 May 6th, 2008 13:11
ground schedule overrules calendar? sascha.harlfinger Planning 0 April 10th, 2008 16:11
Attaching Order Releases to a ground schedule rj5316 Order Processing 1 December 3rd, 2007 09:54
OTM 5.5: Ground Transport Modelling ianlo Planning 4 September 15th, 2007 06:48
CU schedule for v5.5 Barnett , Jada Email List Archive 0 January 24th, 2007 18:51



All times are GMT. The time now is 01:23.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36