Multi-leg with air shipment and deconsol pool


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old May 22nd, 2008, 12:59
Junior Member
 
Join Date: Mar 2008
Posts: 7
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
Sriprada is on a distinguished road
Multi-leg with air shipment and deconsol pool

Hi All,

I work on CU4 5.5 version of OTM.
I've been working on the below scenario which fails to plan shipments, giving the error: "Itninerary failed to plan shipment"

1st leg: Air shipment from Airport A to airport B
2nd leg: Truck load from airport B to deconsolidation pool
3rd leg: TL from deconsolidation pool to destinations 1 and 2 respectively.

I defined air schedule and created consol.
Itinerary is multi-leg with 3 legs as above and "use consol" checkbox maked and "multi-stop" check box unmarked.

Kindly help resolve this problem.
Sri
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old May 22nd, 2008, 20:07
Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 53
Thanks: 4
Thanked 7 Times in 7 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Multi-leg with air shipment and deconsol pool

When you run an RIQ on the individual legs:

1. Airport A to Airport B
2. TL from Airport B to Deconsolidation Point
3. TL from Deconsolidation Point to Final Destination

Do you get results for each?

Also, it sounds like leg 3 is a multistop. Maybe you should check the multistop checkbox on the Itinerary.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old May 23rd, 2008, 08:04
Member
 
Join Date: Mar 2007
Posts: 46
Thanks: 0
Thanked 14 Times in 12 Posts
Groans: 0
Groaned at 1 Time in 1 Post
Rep Power: 0
ravintag is on a distinguished road
Send a message via MSN to ravintag Send a message via Yahoo to ravintag Send a message via Skype™ to ravintag
Re: Multi-leg with air shipment and deconsol pool

hi Sri,

In the Itinerary when you are configuring in the legs for the second leg you need to configure that the second leg is going to Deconsolidation pool by selcting Deconsolidation pool from the drop down (available in the leg) and also mentioning the deconsolidation pool id in the location field box.

check if this has been met. I hope you have configured a multi modal transport mode and mentioned the same in the Itinerary Leg.

Let me know if this was helpful.
__________________
Regards,


Raveendranath Thalapalli
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old May 23rd, 2008, 12:54
Junior Member
 
Join Date: Mar 2008
Posts: 7
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
Sriprada is on a distinguished road
Re: Multi-leg with air shipment and deconsol pool

Hi All,

Thanks for your responses.

I did configure the destination locations as the deconsol pool in the second leg of the itinerary and mentioned the location ID of the pool too.

Also, i created multimodal transport mode (with mode option 'multi') and used this in all 3 legs of the itinerary.

The shipment still fails to plan and gave warning "No feasible shipments created for Itinerary" and "Itinerary is a multileg itinerary with a consol leg, can not build shipment for order releases".

Please advice.

About joe's suggestion of marking multi-stop checkbox, it may not work and it is not possible to build multi-leg itineraries in OTM with that checkbox on.

Best regards,
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old May 27th, 2008, 06:37
Member
 
Join Date: Mar 2007
Posts: 46
Thanks: 0
Thanked 14 Times in 12 Posts
Groans: 0
Groaned at 1 Time in 1 Post
Rep Power: 0
ravintag is on a distinguished road
Send a message via MSN to ravintag Send a message via Yahoo to ravintag Send a message via Skype™ to ravintag
Re: Multi-leg with air shipment and deconsol pool

hi,

Can you let me know what type of Rate Service you are using Simulation or Day Duration with lane to lane time calculation.

Because I feel that some way the application is not able to find distances or time between some locations and may not be able to create shipments as per expectations.

Please let me know your type of rate service and other details if possible.
__________________
Regards,


Raveendranath Thalapalli
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old May 27th, 2008, 07:09
Junior Member
 
Join Date: Mar 2008
Posts: 7
Thanks: 0
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
Sriprada is on a distinguished road
Re: Multi-leg with air shipment and deconsol pool

Hi Ravi,

I have defined two rate services; for the air leg, the type is airschedule while for the TL leg, its simulation.

I have defined an air schedule with daily flights between airport A and B and created a consol.

I suspect, that consol shipments may not be used in multi-leg scenario. Kindly let me know if its true.
I tried a similar scenario but used a consolidation pool before air leg instead of deconsolidation pool after the air leg.
It worked fine when i unchecked the "use consol" checkbox in itinerary.

This scenario is unable to build shipment for some reason
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
[SOLVED] Multi Org Concept in OTM while integrating with EBS OM 12.04 patu2829 OTM / EBS / JDE E1 Integration 4 May 22nd, 2008 15:43
Can not plan multi-stop on multi-leg itinerary murban2110 Planning 0 April 8th, 2008 12:20
Pool shipment otmrookie Planning 6 December 13th, 2007 07:11
Multi Stop Loads cwarner Planning 0 October 31st, 2007 18:48
Pool Shipment XML AlejandroBarba Integration and Data Mapping 0 August 17th, 2007 17:00



All times are GMT. The time now is 05:15.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37