otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTMFAQ Tutorials

OTM SIG
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old October 31st, 2007, 17:48
Member
 
Join Date: Sep 2007
Posts: 43
Thanks: 4
Thanked 6 Times in 6 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0
cwarner is on a distinguished road
Multi Stop Loads

How do other people handle multi stop buy shipments in OTM?

We are trying to send accurate pickup and delivery dates to our suppliers and customers on our buy shipments. We have taken our training environment and turned on conditional booking and set the servprov's up for conditional booking. We have added the SHIPMENT_STOP-PLANNED_ARRIVAL and the SHIPMENT_STOP-PLANNED_DEPARTURE to our conditional booking profile so that the carrier can enter a shipment start and a shipment end date, but we aren't sure how we could deal with the stops that are in the middle of these points. Has anyone else dealt with a similar issue with dates? Is there a better way to do this?

We are using 5.5. CU2 currently, and are testing CU3 with hopes to move it into production in the near future.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Planning Parameters and Multi-Stop Planning Rates joecallan Planning 3 May 23rd, 2008 06:36
Mutlti stop - A->B AND B->C krishna.kk Planning 6 March 21st, 2008 11:32
Continuous Move , Dedicated Loads. skunniyur Planning 6 February 27th, 2008 09:59



All times are GMT. The time now is 12:14.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37