otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
 Follow New Posts:Twitter
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTM Wiki

OTM SIG
OTM Wiki
MavenWire


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old October 14th, 2008, 18:55
Member
 
Join Date: Jan 2007
Posts: 30
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 1
Thanked 0 Times in 0 Posts
Rep Power: 0
slimjim30215 is on a distinguished road
Multi-stops and Bulk Planning

I have an unusual challenge. I'm trying to bulk plan some orders and the desired outcome is a single multi-stop shipment. There are no time constraints to speak of. I can choose "Create Buy Shipment / Multistop" and get the desired outcome. If I choose to bulk plan I get nothing but direct shipments.

I believe the main reason that I'm getting this result is that the rating would be exactly the same, or possibly a tad higher due to out-of-route miles, whether I choose bulk planning or choose multistop. That's just the way the rate structure is, and there's no changing it.

Any ideas on how I can "fool" OTM into believing that a multi-stop (that is really more expensive) is a better outcome than building direct shipments?
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old October 15th, 2008, 05:32
Member
 
Join Date: Nov 2007
Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3
arunk is on a distinguished road
Re: Multi-stops and Bulk Planning

Check out "Rate Quality Factors" in OTM. You can increase/decrease your rates by a certain percentage or flat fee and assign that to your multistop rate offfering and rate record, so that when planning OTM can give preference to your multistop rates than the others.

PS Rate quality factors do not affect the actual cost to ship and are only used in qualifying a shipment.
__________________
Regds
Arun.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old October 17th, 2008, 15:21
Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 82
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 4
Thanked 11 Times in 10 Posts
Rep Power: 3
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Multi-stops and Bulk Planning

You may want to try setting up a Container Opt Configuration where the Maximize Container Utilization box is not checked (only the Minimize Number of Containers is checked within the Objectives Section).

See the attached.
Attached Files
File Type: doc Conopt Config.doc (54.0 KB, 23 views)
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Multi-stops Sell Shipment Siewlng Planning 21 August 14th, 2009 13:53
Error while uploading the rate_offering stops through multi table csv cool_brat Data Loading 6 December 11th, 2008 11:09
[SOLVED] Bulk plan works then stops cmcintos Planning 4 July 8th, 2008 18:26
Planning Parameters and Multi-Stop Planning Rates joecallan Planning 3 May 23rd, 2008 06:36
Planning parameters and properties in v5.5 to improve Bulk Planning sknmail@rediffmail.com Performance, Scalability and HA 5 April 25th, 2008 14:30



All times are GMT. The time now is 04:38.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40