otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
 Follow New Posts:Twitter
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTM Wiki

OTM SIG
OTM Wiki
MavenWire

Go Back   Oracle OTM / G-Log GC3 Community Support > OTM / G-Log - Functional Topics > Planning
Reload this Page

Multistop Shipment With P/d At Same Location


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old September 18th, 2008, 11:07
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Question Multistop Shipment With P/d At Same Location

scenario:
Order release
1. A->B
2. B->A

want to create 1 multistop shipment i.e A->B->B->A ( like a return trip) - thus both P/D activity happening at same location i.e. B

Rate record: region to region(A and B)
Itineray: multistop-region to region(A and B)

Bulk planning is resulting in 2 independent shipments
Can you please suggest some approach to build above desired shipment using planning
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old September 19th, 2008, 05:55
Member
 
Join Date: Mar 2007
Posts: 48
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 15 Times in 13 Posts
Rep Power: 0
ravintag is on a distinguished road
Send a message via MSN to ravintag Send a message via Yahoo to ravintag Send a message via Skype™ to ravintag
Re: Multistop Shipment With P/d At Same Location

Try defining the location role of B as Shipfrom/Shipto and Consol as well.
__________________
Regards,


Raveendranath Thalapalli
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old September 19th, 2008, 06:01
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Re: Multistop Shipment With P/d At Same Location

Thanks for your response

Even after defining Location B as both ship from/to and consol role type; still system is not planning single multi-stop (return trip) shipment.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old September 19th, 2008, 06:41
Member
 
Join Date: Nov 2007
Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3
arunk is on a distinguished road
Re: Multistop Shipment With P/d At Same Location

Any time constraints in the OR's like Pickup & Delivery dates? Also does it allow you to force merge the two shipments?

Regds--
Arun
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old September 19th, 2008, 06:49
Senior Member
 
Join Date: May 2007
Posts: 119
Groans: 2
Groaned at 0 Times in 0 Posts
Thanks: 23
Thanked 8 Times in 7 Posts
Rep Power: 3
krishna.kk is on a distinguished road
Re: Multistop Shipment With P/d At Same Location

HI ,

As per OTM this is Continous tour .

Even then it creates two shipments but it use the same truck .

B-A shipment starts only after a-b shuipment gets delivered.

U have do a total diffrent setupfor this .

Rgd
kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old September 19th, 2008, 08:13
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Re: Multistop Shipment With P/d At Same Location

In case of continuous move(CM), there will be two different shipments ( i.e two different equipments ) linked together - Then how can we assume that they are being carried in same truck/trailer?

When we tender these shipments to carriers, there will be two different tenders - How will carriers come to know whether they need to send 1 or 2 equipments to carry these two shipments?
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7 (permalink)  
Old September 19th, 2008, 08:20
Senior Member
 
Join Date: Sep 2007
Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3
nipunlakhotia is on a distinguished road
Send a message via Yahoo to nipunlakhotia
Re: Multistop Shipment With P/d At Same Location

Hi Arun,

Even after mentioning matching pickup/delivery dates in Order releases ( so that round trip is feasible), system is not making single multistop shipment.

System is allowing forced merge of these two shipments into 1, but while doing that no proper P/D sequence is maintained i.e. system is creating PPDD rather than PDPD seq. Also pickup/delivery times are not correct on shipment formed after merging.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #8 (permalink)  
Old September 29th, 2008, 08:44
Member
 
Join Date: Nov 2007
Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3
arunk is on a distinguished road
Re: Multistop Shipment With P/d At Same Location

Quote:
Originally Posted by nipunlakhotia View Post
scenario:
Order release
1. A->B
2. B->A

want to create 1 multistop shipment i.e A->B->B->A ( like a return trip) - thus both P/D activity happening at same location i.e. B

Rate record: region to region(A and B)
Itineray: multistop-region to region(A and B)

Bulk planning is resulting in 2 independent shipments
Can you please suggest some approach to build above desired shipment using planning
Hi,

Able to acheive the scenario?
__________________
Regds
Arun.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #9 (permalink)  
Old September 29th, 2008, 09:21
Senior Member
 
Join Date: May 2007
Posts: 119
Groans: 2
Groaned at 0 Times in 0 Posts
Thanks: 23
Thanked 8 Times in 7 Posts
Rep Power: 3
krishna.kk is on a distinguished road
Re: Multistop Shipment With P/d At Same Location

Hi ,

To my knowledge there is no way u can achevive (A->B->B->A ( like a return trip)it in OTM .

I mean u cant creat single shipment for the above requirment .

But continous move works if (A->B->B->A ) But it creates two shipments but uses the same truck or equipment .

Rgd
kishore
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #10 (permalink)  
Old September 29th, 2008, 09:53
Member
 
Join Date: Nov 2007
Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3
arunk is on a distinguished road
Re: Multistop Shipment With P/d At Same Location

Quote:
Originally Posted by krishna.kk View Post
Hi ,

To my knowledge there is no way u can achevive (A->B->B->A ( like a return trip)it in OTM .

I mean u cant creat single shipment for the above requirment .

But continous move works if (A->B->B->A ) But it creates two shipments but uses the same truck or equipment .

Rgd
kishore
Kishore,

You can acheive the scenario with single shipment by using static/dynamic trip and define the stop activities in a ground schedule. And iam able to do that. But i just wanted to know if that is possible with a multistop itinerary as orginally posted by Nipunlakhotia.
Attached Images
File Type: jpg PDPD_shipment.jpg (36.5 KB, 62 views)
__________________
Regds
Arun.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Has anyone worked on location based shipment search? kabaliganesan Order Processing 7 July 14th, 2009 14:14
Any way to plan 2 leg from different itinerary into a multistop shipment? yeowleng Planning 8 July 7th, 2009 08:36
Location ID vs Location address otmrookie Planning 2 July 23rd, 2008 09:06
Restricting Shipment Stops in Multistop Tony Drake Planning 3 March 14th, 2008 18:23
[SOLVED] multistop shipment krishna.kk Freight Forwarding 1 August 2nd, 2007 18:26



All times are GMT. The time now is 03:59.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40