| | Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization. |  | | 
September 18th, 2008, 11:07
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | Multistop Shipment With P/d At Same Location scenario:
Order release
1. A->B
2. B->A
want to create 1 multistop shipment i.e A->B->B->A ( like a return trip) - thus both P/D activity happening at same location i.e. B
Rate record: region to region(A and B)
Itineray: multistop-region to region(A and B)
Bulk planning is resulting in 2 independent shipments
Can you please suggest some approach to build above desired shipment using planning | 
September 19th, 2008, 05:55
| | Member | | Join Date: Mar 2007
Posts: 48
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 15 Times in 13 Posts
Rep Power: 0 | | | Re: Multistop Shipment With P/d At Same Location Try defining the location role of B as Shipfrom/Shipto and Consol as well.
__________________ Regards,
Raveendranath Thalapalli | 
September 19th, 2008, 06:01
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location Thanks for your response
Even after defining Location B as both ship from/to and consol role type; still system is not planning single multi-stop (return trip) shipment. | 
September 19th, 2008, 06:41
| | Member | | Join Date: Nov 2007 Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location Any time constraints in the OR's like Pickup & Delivery dates? Also does it allow you to force merge the two shipments?
Regds--
Arun | 
September 19th, 2008, 06:49
| | Senior Member | | Join Date: May 2007
Posts: 119
Groans: 2
Groaned at 0 Times in 0 Posts
Thanks: 23
Thanked 8 Times in 7 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location HI ,
As per OTM this is Continous tour .
Even then it creates two shipments but it use the same truck .
B-A shipment starts only after a-b shuipment gets delivered.
U have do a total diffrent setupfor this .
Rgd
kishore | 
September 19th, 2008, 08:13
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location In case of continuous move(CM), there will be two different shipments ( i.e two different equipments ) linked together - Then how can we assume that they are being carried in same truck/trailer?
When we tender these shipments to carriers, there will be two different tenders - How will carriers come to know whether they need to send 1 or 2 equipments to carry these two shipments? | 
September 19th, 2008, 08:20
| | Senior Member | | Join Date: Sep 2007 Location: india
Posts: 182
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 7
Thanked 13 Times in 13 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location Hi Arun,
Even after mentioning matching pickup/delivery dates in Order releases ( so that round trip is feasible), system is not making single multistop shipment.
System is allowing forced merge of these two shipments into 1, but while doing that no proper P/D sequence is maintained i.e. system is creating PPDD rather than PDPD seq. Also pickup/delivery times are not correct on shipment formed after merging. | 
September 29th, 2008, 08:44
| | Member | | Join Date: Nov 2007 Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location Quote:
Originally Posted by nipunlakhotia scenario:
Order release
1. A->B
2. B->A
want to create 1 multistop shipment i.e A->B->B->A ( like a return trip) - thus both P/D activity happening at same location i.e. B
Rate record: region to region(A and B)
Itineray: multistop-region to region(A and B)
Bulk planning is resulting in 2 independent shipments
Can you please suggest some approach to build above desired shipment using planning | Hi,
Able to acheive the scenario?
__________________ Regds
Arun. | 
September 29th, 2008, 09:21
| | Senior Member | | Join Date: May 2007
Posts: 119
Groans: 2
Groaned at 0 Times in 0 Posts
Thanks: 23
Thanked 8 Times in 7 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location Hi ,
To my knowledge there is no way u can achevive (A->B->B->A ( like a return trip)it in OTM .
I mean u cant creat single shipment for the above requirment .
But continous move works if (A->B->B->A ) But it creates two shipments but uses the same truck or equipment .
Rgd
kishore | 
September 29th, 2008, 09:53
| | Member | | Join Date: Nov 2007 Location: Chennai, India
Posts: 90
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 10
Thanked 3 Times in 3 Posts
Rep Power: 3 | | | Re: Multistop Shipment With P/d At Same Location Quote:
Originally Posted by krishna.kk Hi ,
To my knowledge there is no way u can achevive (A->B->B->A ( like a return trip)it in OTM .
I mean u cant creat single shipment for the above requirment .
But continous move works if (A->B->B->A ) But it creates two shipments but uses the same truck or equipment .
Rgd
kishore | Kishore,
You can acheive the scenario with single shipment by using static/dynamic trip and define the stop activities in a ground schedule. And iam able to do that. But i just wanted to know if that is possible with a multistop itinerary as orginally posted by Nipunlakhotia.
__________________ Regds
Arun. |  | | | Thread Tools | | | | Display Modes | Linear Mode |
Posting Rules
| | | | |