otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTMFAQ Tutorials

OTM SIG
MavenWire

Go Back   Oracle OTM / G-Log GC3 Community Support > OTM / G-Log - Functional Topics > Planning
Reload this Page

Note: OTM 5.5 CU3 ERU Planning Causes JVM Crash


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old April 3rd, 2008, 06:47
Senior Member and Blogger
 
Join Date: Dec 2006
Location: Singapore
Posts: 149
Blog Entries: 5
Thanks: 5
Thanked 11 Times in 10 Posts
Groans: 0
Groaned at 1 Time in 1 Post
Rep Power: 2
ianlo is on a distinguished road
Send a message via AIM to ianlo Send a message via Skype™ to ianlo
Note: OTM 5.5 CU3 ERU Planning Causes JVM Crash

Hi everyone,

Would like to share with everyone that after struggling with ERU planning with Load Configuration planning parameters, I have managed to simulate several scenarios including one that causes a JVM crash.

If your configuration has:
  • Ship Unit with no dimensions only weight and volume
  • Equipment Group with dimensions and weight and volume
  • Order Release Ship Unit – no dimensions only weight and volume
When you plan with the following planning parameters:
  • AutoCalc Weight & Volume = true
  • Check Equipment Capacity in Reference Units = true
  • Load Config Engine Type = Pattern Based Optimised
  • Container Opt Id = <your own config>
  • Load Config Volume Threshold = <your own value>
Your order will not plan successfully, and the planning engine will run indefinately and will crash the JVM when it finally runs out of memory.

In addition, Oracle Support has confirmed that ERU and Load Configuration only works together in 5.5 CU 4! - But this has yet to be verified independently

So for those who are using both ERU and Load Config in the same planning parameter please note. I will post my results once I migrate to CU4..

Here are some of my other threads following the ERU issue I faced:

OTM 5.5 CU3: Equipment Reference Units? - Oracle OTM / G-Log GC3 Community Support
http://www.otmfaq.com/forums/f15/wro...1086/#post2785 (Wrong Results With Equipment Reference Units (again!) - 5.5 CU3 RU4)

Hope this helps!
Ian

Last edited by ianlo : April 3rd, 2008 at 06:50.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Planning Parameters and Multi-Stop Planning Rates joecallan Planning 3 May 23rd, 2008 07:36
Planning parameters and properties in v5.5 to improve Bulk Planning sknmail@rediffmail.com Performance, Scalability and HA 5 April 25th, 2008 15:30
Usage of Debit Note sheriff Settlement 12 November 7th, 2007 09:50
[SOLVED] Exporting large reports to Excel causes crash chrisplough Reports / FTI and Other Analytics 0 October 2nd, 2007 19:13



All times are GMT. The time now is 05:14.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37