[SOLVED] 5.5 CU3: Bulk Plan Does Not Consol A Subset Of Selected Orders Into Expected


Planning Planning orders in OTM / G-Log - including bulk planning, itineraries, planning parameters, load configuration and optimization.

Closed Thread
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old August 7th, 2007, 01:49
Senior Member and Blogger
 
Join Date: Dec 2006
Location: Singapore
Posts: 141
Blog Entries: 5
Thanks: 5
Thanked 11 Times in 10 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
ianlo is on a distinguished road
Send a message via AIM to ianlo Send a message via Skype™ to ianlo
[SOLVED] 5.5 CU3: Bulk Plan Does Not Consol A Subset Of Selected Orders Into Expected

Hi everyone, I am encountering an issue with bulk planning on OTM 5.5 CU3. Basically, bulk plan does not consolidate orders having pickup and delivery time windows that are close by each other. Expected results are two shipments built, instead four individual shipments are built.

Summary:
Four order movements bulked plan together did not yield an optimal result. In these four order movements, two of them OM1 and OM2 can be consolidated into one shipment as they have a pickup and delivery time window that is close to each other; and another two, OM3 and OM4 could have also been consolidated for the same reason. I've managed to prove my hypothesis by performing bulk planning separately on OM1 and OM2 to yield ONE shipment. Likewise, on OM3 and OM4.

Observed results:
4 OMs bulked plan resulted in 4 individual shipments

Expected results:
4 OMs bulked plan should result in two shipments, i.e. 2 OMs consolidated into one, and the other 2 OMs consolidated into another.

Business impact:
The current behaviour results in a shipment cost that is much higher than what is optimal. In the example on my slides, the shipment cost resulted from the bulk plan is 100% more because there was no consolidation.

Has anyone encountered such an issue? Attached is the powerpoint description of the issue.

Appreciate any replies!

Thanks!
Ian
Attached Files
File Type: ppt Bulk_plan_results_not_optimized.ppt (341.5 KB, 10 views)
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
  #2 (permalink)  
Old August 17th, 2007, 00:28
Senior Member and Blogger
 
Join Date: Dec 2006
Location: Singapore
Posts: 141
Blog Entries: 5
Thanks: 5
Thanked 11 Times in 10 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2
ianlo is on a distinguished road
Send a message via AIM to ianlo Send a message via Skype™ to ianlo
Re: 5.5 CU3: Bulk Plan Does Not Consol A Subset Of Selected Orders Into Expected Ship

Hi everyone,

Fyi, I have resolved this with the help of Oracle Support. The solution is as follows:

There are two problems that are causing the consolidation to fail.

1. The default consolidation logic for same origin/destination orders is greedy and attempting to is not evaluating all options to be consolidated. It eventually fails and results in 4 shipments. This is controlled by the already visited property (earlier discussed). This controls the use of the "greedy" algorithm or the iterative algorithm. Therefore suggestion is that we make the following permanent property change:

glog.business.consolidation.multistop.disableSameO DPairing = true

2. The consolidation is done via the Multistop logic (even though the orders have the same origin/destination). The multistop logic first ignores the interim stop as it is trying to consolidate the potential shipments. Because of this, we are trying to locate the Service Time between the order's source location and destination location.

In the example, we do not have any Service information defined for the leg: Origin -> Final Dest and therefore this calculation is failing.

You will need to define this information in your rate service to allow the Multistop to complete successfuly.


Thanks to Oracle Support for this info!
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
The Following User Says Thank You to ianlo For This Useful Post:
bmj_23 (August 18th, 2007)
Closed Thread



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
which should preceed - Itineraries or shipment generation from a consol in a charter pradeepsundar.v Order Processing 0 January 24th, 2008 12:03
Bulk Plan Vs Direct rj5316 Planning 1 December 3rd, 2007 12:38
[SOLVED] Back orders krishna.kk Order Processing 1 June 18th, 2007 19:04
RE: Order release splitting in v5.5 bulk planning (load config) Rick v100 Email List Archive 0 December 12th, 2006 16:30
Order release splitting in v5.5 bulk planning (load config) Mauricio Ramirez Email List Archive 1 December 12th, 2006 11:40



All times are GMT. The time now is 23:51.
Copyright © 2008, Open Book Solutions LLC. All rights reserved.

Sponsored by MavenWire - MavenWire.com


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37