Rep Power: 0 | | [SOLVED] Key Factors for building a X-Dock / Pooling shipments Dear All,
I have tried a dozens of time to built shipments with x-dock. I wasn't successful in building the same. I have configured the setup with assistance of OTM Help. I am sure about the fact that I am missing-out some key configuration issue to built a shipment thru pool / x-dock.
Can any one list out the key configurations that would effect a x-dock / pool thru shipments in OTM 5.5, please?
- sanju | 
June 15th, 2007, 18:23
| | Senior Member and Blogger | | Join Date: Nov 2006 Location: San Diego, CA
Posts: 76
Thanks: 0
Thanked 18 Times in 17 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2 | | | Re: Key Factors for building a X-Dock / Pooling shipments Hi Sanju,
Have you checked the log after you run the bulk plan? It is kind of a pain but it could give you some direction to what the problem may be (itinerary, rate offering, rate record, time constraint, etc.)
Hope it helps,
Alejandro B. | 
June 18th, 2007, 09:17
| | Junior Member | | Join Date: Dec 2006
Posts: 16
Thanks: 4
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0 | | | Re: Key Factors for building a X-Dock / Pooling shipments Hi Alejandro,
Many thanks for your reply. Infact I tried to understand what OTM is doing when the bulk plan is on, all I can see is that X-Dock is being considered in terms of itineraries, RR& RO, but OTM ignores the x-dock and builts a multi-stop shipment. My configuration towards the consideration for a x-dock also seems to be perfect.
BTW- - As adviced, I shall check with the logs, more extensively to fx this issue.
Many thanks once again
- Sanju | 
June 18th, 2007, 09:55
| | Senior Member and Blogger | | Join Date: May 2007
Posts: 170
Thanks: 4
Thanked 31 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2 | | | Re: Key Factors for building a X-Dock / Pooling shipments Have you configured the parameters on your itinerary relating to cross docks correctly ?
I think you need to populate the Minimum Stopoff Weight/Volume, Maximum XDock Weight/Volume, Minimum Total Weight or Min TL Volume fields correctly.
Make sure you have some values entered into these fields and you may also just want to have a read through the online help for the itinerary header which explains these fields, and their impact, in a reasonable amount of detail.
Post again if you are still having issues. | | The Following User Says Thank You to bmj_23 For This Useful Post: | | 
July 6th, 2007, 09:49
| | Junior Member | | Join Date: Dec 2006
Posts: 16
Thanks: 4
Thanked 0 Times in 0 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 0 | | | Re: Key Factors for building a X-Dock / Pooling shipments Hi,
Thanks again.
Currently, I was successful in building a X-DOCK shipment when I constrained "Must Ship Thru X-dock" option in Order level.
But for this option checked, I am still unsuccessful in making OTM to build a x-dock intelligently. I want to understand, do we need to always check the above mentioned option in order level to effect a x-dock / pool shipment?
Regards
- Sanju | 
July 6th, 2007, 14:17
| | Senior Member and Blogger | | Join Date: May 2007
Posts: 170
Thanks: 4
Thanked 31 Times in 31 Posts
Groans: 0
Groaned at 0 Times in 0 Posts
Rep Power: 2 | | | Re: Key Factors for building a X-Dock / Pooling shipments My advice would be:
1. Take one order and check that without a cross dock on the lane that will build a direct shipment.
2. Take two orders with the same source and destination and make sure they build a direct shipment.
3. Add in a cross dock on the location and make sure that the option via the cross dock is cheaper and feasible (draw out the costs on a piece of paper)
You may need to have both a direct cost and a via cross dock cost in order for OTM to evaluate which is the cheapest.