Closed Thread
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old March 25th, 2009, 17:56
Member
 
Join Date: Aug 2008
Location: Hyderabad
Posts: 44
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 9
Thanked 0 Times in 0 Posts
Rep Power: 0
anirban1982 is on a distinguished road
Send a message via Yahoo to anirban1982 Send a message via Skype™ to anirban1982
[SOLVED] Multistop 1leg of multileg

Hi Friends,
I have the following scenario:
A->B->C->D->E
I have 2 order releases A->B and A->E.
The same truck goes from A->B->C and then another truck from C->D and another one from D->E.
I created a multileg itinerary for this with A as source and destination region as B,E.
Leg 1: A->C
Leg 2: C->D
Leg 3: D->E
The first leg is MULTISTOP INTO ONE EQUIPMENT. Created rate record for all the legs. and also from A->B. When i plan the 2 order releases it gives me 6 shipments. But wanted only 3. I wanted the o/p to be like this:
A->B->C multistop for the first leg,
C->D
D->E

Can someone please help me out here in achieving this....

Regards,
Anirban Roy
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
  #2 (permalink)  
Old March 26th, 2009, 00:42
Member
 
Join Date: Jun 2007
Location: Havertown, PA
Posts: 82
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 4
Thanked 11 Times in 10 Posts
Rep Power: 3
joecallan is on a distinguished road
Send a message via AIM to joecallan Send a message via Yahoo to joecallan
Re: Multistop 1leg of multileg

I don't understand how you would get 6 shipments in your scenario? I would think you would get 4.

1. A to B
2. A to C
3. C to D
4. D to E
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
  #3 (permalink)  
Old March 26th, 2009, 12:01
Member
 
Join Date: Aug 2008
Location: Hyderabad
Posts: 44
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 9
Thanked 0 Times in 0 Posts
Rep Power: 0
anirban1982 is on a distinguished road
Send a message via Yahoo to anirban1982 Send a message via Skype™ to anirban1982
Re: Multistop 1leg of multileg

Yes, it is creating 6 shipments even though i have given the destination id in the last leg. i tried a few more things. Can someone please let me know if this is possible and what i should be doing to make this happen:

There are 6 locations (A,B,C,D,E,F). 2 order releases are created. A->F and A->C. Expected Shipments:
A->B
B->C
B->D
D->E
E->F
i.e. 5 shipments. We created the itinerary with the following details:
Source->A
Destination->F,C in a region.
There are 4 legs in the itinerary.
Leg 1: destination B, role as De-consolidation (Auto consolidate: consol into one equipment)
Leg 2: destination as location profile of C,D. role as Ship from/Ship to.
Leg 3: destination E, location profile ship to/ ship from
Leg 4: destination F, location profile ship to/ ship from. Also given a location profile which says not compatible with C.
The ORs are bulk planned. The OR from A->F is getting planned correctly i.e. it is splitting into A->B,B->D,D->E,E->F
But the OR from A->C, it is splitting in the following way: A->B,B->C,C->E,E->C instead of just 2 shipments i.e. A->B and B->C.
When we do a bulk plan of both the ORs i.e. A->C and A->F it creates 8 shipments.

We were expecting 5 shipments. The shipments for OR A->C should have ended on leg 2 itself but continued to the last leg even though destination Id in Leg 4 was F.

Please do let me know if we can achieve this scenario.
Thanks
Anirban Roy
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
  #4 (permalink)  
Old March 27th, 2009, 15:34
Member
 
Join Date: Aug 2008
Location: Hyderabad
Posts: 44
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 9
Thanked 0 Times in 0 Posts
Rep Power: 0
anirban1982 is on a distinguished road
Send a message via Yahoo to anirban1982 Send a message via Skype™ to anirban1982
Re: Multistop 1leg of multileg

I was able to get this scenario working. Parameter short circuit leg needs to be set to true.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Closed Thread


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Multileg scenario with consolidation/deconsolidation pools tailsjt Planning 11 October 7th, 2008 10:16
Pool through Multistop or multileg itinerary? cool_brat Planning 6 July 19th, 2008 18:58
[SOLVED] MultiStop Scenario cool_brat Planning 17 May 23rd, 2008 06:46
unble to create multileg with attached data r12ohit Planning 2 April 14th, 2008 05:40
[SOLVED] multistop shipment krishna.kk Freight Forwarding 1 August 2nd, 2007 18:26



All times are GMT. The time now is 17:14.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40