otmfaqForumsBlogsRegister
FAQMembers ListCalendarToday's PostsSearch


 Subscribe Blogs:RSS
 Subscribe Forums:RSS
 Follow New Posts:Twitter
OTMFAQ Home
OTMFAQ Blogs
OTMFAQ Forums
OTM Wiki

OTM SIG
OTM Wiki
MavenWire

Go Back   Oracle OTM / G-Log GC3 Community Support > OTM / G-Log - Functional Topics > Rating
Reload this Page

Procurement : Build rate action and Computed Cost


Rating Configuring and troubleshooting Rating and RIQ in OTM / G-Log.

Reply
 
Submit Tools LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old February 6th, 2008, 08:11
Junior Member
 
Join Date: Dec 2007
Posts: 26
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
Arpit is on a distinguished road
Procurement : Build rate action and Computed Cost

Hi,

I am currently working on OTM procurement module and I am facing below issues:-
1) Build Rate action is not working.
2) At per the help guide the action populates OTM rate tables within the procurement database. Can we get
the details of this table?
3) In each bid system automatically calculates Computed Cost for a bid based on which Solution will select bid for a Bid
Round. In our case system is taking flat cost entered in bid as Computed Cost
and is not considering Variable Cost.
4) Help option and User guide does not talk about the concept of Computed Cost, Overriding Minimum Cost, Overriding
Maximum Cost, Minimum Percentage of Loads and Maximum Percentage of Loads and
how computed cost is calculated. Please suggest some document on these
concepts.

Regards
Arpit Tiwari
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Rate record - Multi Cost Rule - Shipment surender Rating 20 June 12th, 2009 04:14
rate Cost for LTL offering type anand_k Rating 5 March 5th, 2009 04:12
Automating an action on "Rate Factor" MURTHYKO Rating 2 October 27th, 2008 11:02
Actual Cost versus Planned Cost Christopher Collins Feature Requests and Inquiries 0 September 11th, 2008 13:31
[SOLVED] Rate Setup - Build Shipment error saufil chang Planning 2 June 29th, 2007 07:14



All times are GMT. The time now is 14:10.
Copyright © 2006-2009, Open Book Solutions LLC. All rights reserved.


Inactive Reminders By Icora Web Design

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40